Acronyms
API Active Pharmaceutical Ingredient
BMS Building Management System - or Batch Management Software
BOD Basis of Design
CIP Clean In Place
COTS Commercial Off the Shelf Software
DCS Distributed Control System
DQ Design Qualification
EHS Environmental Health and Safety
EPC Engineering Procurement and Construction
ERES Electronic Records and Electronic Signatures
ESD Emergency Shutdown System
ETCM Engineering Technology and Capital Management
FAT Factory Acceptance Testing
FDS Functional Design Specification
FRA Functional Requirements Analysis
FRS Functional Requirements Specification
FTA Fault Tree Analysis
FS Functional Specification
GEP Good Engineering Practice
GMP Good Manufacturing Practice
GUI Graphical User Interface
HAZOP Hazard and Operability Review
HMI Human Machine Interface
IQ Installation Qualification
I/O Input Output
LSOP Local Standard Operating Procedure
MES Manufacturing Execution System
OEM Original Equipment Manufacturer
OQ Operational Qualification
PDI Pre-Delivery Inspection
PCS Process Control System (eg DCS or PLC)
PFD Process Flow Diagram
PID Proportional Integral Derivative
PLC Programmable Logic Controller
PQ Performance Qualification
P&ID Piping and Instrument Diagram
QA Quality Assurance
RFQ Request for Quotation
RS Requirements Specification
RTM Requirements Traceability Matrix
SAMA Scientific Apparatus Makers Association
SCADA Supervisory Control and Data Acquisition
SCR Source Code Review
SFC Sequence Function Chart
SOP Standard Operating Procedure
STD State Transition Diagram
TBA To Be Advised
TBC To Be Confirmed
URS User Requirements Specification
VTA Vendor To Advise